Cogeneration Service Information
How do you change the electric service into new owners name?
If the service is changing to another individual, please complete the membership application and review the Code of Regulations. Please return a signed membership applicaiton via
e-mail
Mail: PO Box 112 ; Millersburg, Ohio 44654
or Fax: 330-674-1869
A deposited may be collected based on your credit rating. Deposits collected are credited back to the member
after six months of consecutive on-time payments.
How do you establish service for new residence or business?
Please complete the membership application and review the Code of Regulations. Please return a signed membership applicaiton via
e-mail
Mail: PO Box 112 ; Millersburg, Ohio 44654
or Fax: 330-674-1869
We will then determine the type of service you are signing up for and the appropriate
rate class. A deposit may be collected based on your credit rating. Deposits collected are credited back to the member
after six months of consecutive on-time payments.
Service
Charge |
All
new services
will be charged $250.00
|
Overhead
Primary
Permanent Residence Mobile Home Seasonal Home |
$4.30/ft.
over 900 ft.
along public road
$4.30/ft. over 300 ft.
off public road
|
Overhead
Secondary
|
No
charge - 200 ft. maximum |
Underground
Secondary |
150
ft. (trench length)
4/0 TX - no charge
$2.00/ft. over first 100 ft.
for 350 MCM TX (maximum
250 ft. trench
length)
|
Underground
Primary
Individual
Developer |
$1.00/ft.
up to 300 ft. off road
$5.30/ft. plus $2500
for each transformer Holmes-Wayne
furnishes 2
inch pipe.
Actual cost, reimbursed per
lot hook-up for maximum
of five years.
|
Right-of-Way
Clearing - 1st time |
Customer
clears ROW
on his own property.
Holmes-Wayne clears
ROW in all other
areas,
public, or private.
|
Temporary
Service
|
No
Charge
|
Oil
Wells & Freezer Barns
Primary Overhead |
$4.30/ft.
for entire line length |
Note: Customer is responsible for all trenching and backfilling, 3 inch sch.40 PVC required for secondary cable.