Central Hookup - Farm
Overhead Service - Residential
Underground Metering Point
Underground Secondary Service from Existing Overhead Primary
Pole - Residential
Underground Secondary Service from Existing Underground Primary Vault - Residential
Temporary Overhead Service using Entrance Cable for Construction
Temporary Overhead Service using Conduit for Construction
Temporary Underground Service for Construction
Temporary Overhead Service for Trailer using Entrance Cable
Temporary Overhead Service for Trailer using Conduit
Primary Underground/Secondary Underground Service - Residential
Housing Development - Primary Underground Vault Specifications
Standard new service fee up to 200 amp meter base is $250.
Note: Customer is responsible for all trenching and backfilling, 3 inch sch.40 PVC required for secondary cable.
Service
Charge |
All
new services
will be charged $250.00
|
Overhead
Primary
Permanent Residence Mobile Home Seasonal Home |
$4.30/ft.
over 900 ft.
along public road
$4.30/ft. over 300 ft.
off public road
|
Overhead
Secondary
|
No
charge - 200 ft. maximum |
Underground
Secondary |
150
ft. (trench length)
4/0 TX - no charge
$2.00/ft. over first 100 ft.
for 350 MCM TX (maximum
250 ft. trench
length)
|
Underground
Primary
Individual
Developer |
$1.00/ft.
up to 300 ft. off road
$5.30/ft. plus $2500
for each transformer Holmes-Wayne
furnishes 2
inch pipe.
Actual cost, reimbursed per
lot hook-up for maximum
of five years.
|
Right-of-Way
Clearing - 1st time |
Customer
clears ROW
on his own property.
Holmes-Wayne clears
ROW in all other
areas,
public, or private.
|
Temporary
Service
|
No
Charge
|
Oil
Wells & Freezer Barns
Primary Overhead |
$4.30/ft.
for entire line length |